The Biden-Harris administration announced the Interior Department’s approval for the construction of the Ten West Link Transmission Line project, which represents another significant milestone in lowering consumers’ energy costs and modernizing America’s power infrastructure in the West by permitting at least 25 gigawatts of solar, wind and geothermal production on public lands by 2025.
“Change Moves at the Speed of Trust”: EcoBlock at DAC Weatherization Conference
EcoBlock’s Dr. Therese Peffer and Rich Brown highlighted strategies for effective community-scale decarbonization, including: sustained resident engagement, bundling home performance and low-power electrification upgrades, and leveraging the economies of scale associated with block-level retrofits.
